Tank base guide

Get your base tank-ready.

Start with why it matters, then use the arrows to follow 8 steps in order.

  1. Why it matters

    Every 1,000 litres weighs a tonne.

    A full 30,000 L tank weighs 30 t. A weak base can void your warranty.

  2. Plan

    Pick a spot the trailer can reach.

    We unload from the side, so leave room to pull up beside it.

  3. Plan

    Support the whole tank.

    The finished base must be flat, level and have no overhang.

    • Slab or pavers: 100 mm extra.
    • Crusher dust: 150 mm extra.
  4. Prepare

    Prepare for your base type.

    Remove grass, roots and soft soil for even support.

    • For pavers specifically, dig down to firm ground.
  5. Prepare

    Choose an accepted base.

    Concrete, pavers, crusher dust or an engineer-certified stand.

    • Concrete is the first choice.
    • Crusher dust is for large round tanks only.
    • Sand or clay alone is unsuitable.
  6. Build

    Follow the concrete rules.

    100 mm thick, F62 mesh, flat and smooth with a trowel finish.

    • Make it 100 mm extra.
    • Cure it for 5 days.
    • On a slope, go thicker with heavier mesh.
  7. Build

    Follow the paver rules.

    75 mm sand-cement bedding on firm ground; 100 mm extra.

    • First fill: first two corrugations for 48 hours.
  8. Build

    Check dust or stand rules.

    Crusher dust: 150 mm deep, compacted, bordered and 150 mm extra.

    • Lay geotextile fabric beneath the crusher dust.
    • No crusher pieces over 5 mm; gravel over exposed dust.
    • Stand: engineer-certified. Flat, level and smooth on top, with gaps no more than 20 mm.
  9. Delivery

    We place it. You fill it.

    Finish before delivery and run the overflow 2 m+ away.

    • Fill it straight away, or tie it down until it has water.
    • Do not move the tank after we place it.
    • Tighten all outlets after delivery, as they can loosen during transport.
    • Remove the plastic protective wrap from stainless steel tanks after plumbing is complete.